欧美日韩精品_69堂亚洲国产日韩精品无码专区成人妻中文字幕一区二区三区在线久久久久_亚洲精品一区二区三区在线

Welcome to [ Wuxi Funecon Precision Mould Plastic Co., Ltd. ] website! Home| Sitemap| Email
Moulding Your Future

Enquiry:

138-6185-1071

138-6185-1071

What are the main aspects of injection mold cooling water leakage

Injection mold cooling water leakage is a frequent occurrence, for many reasons, mainly in the following aspects:
The most occurs at the joint of the mold cooling water pipe. If water leakage is found, the sealing tape should be wound around the thread of the pipe joint and then tightened.
2, Due to long-term molding conditions, the waterproof ring inside the mold will be damaged, and the O-shaped waterproof rubber ring will easily harden and crack, resulting in water leakage. Some poorly installed waterproof rings can also cause seal failure. It is generally necessary to regularly check the installation position and sealing performance of the seal.
3, The hole wall of the cooling water hole is broken. This often happens when a new mold is tried. The wall thickness of the design is sufficient, but the hole wall is broken due to machining errors or post-processing. In most cases, leaking water holes can no longer be used.
4, Regularly repair the heating pipe and decompression pump and use. The heating tube is an effective heat transfer element and is very effective for core cooling of deep and deep structures. In the area where the cooling water is easy to pass, a one-way heating pipe is provided to reduce water leakage. In addition, the use of a vacuum pump to pump cooling water is also a method to prevent leakage of cooling water.
5, maintenance of the cooling water hole. It is easy to form scale in the cooling water hole, which hinders heat transfer. In severe cases, the water path is blocked and needs regular maintenance. For straight water holes, an iron bar that is 0.5 mm smaller than the diameter of the cooling water hole can be inserted and tapped with a hammer to remove scale and rust. For the cooling water pipe buried in the mold, the mold should be disassembled to remove rust.
After the inspection, the water leakage test should be carried out. The hand pressure pump is used to fill the water hole with water, and it is kept at a pressure of 2 MPa for 5 minutes. It is judged whether the water hole leaks by observing whether the water pressure is lowered. The water leakage can be blocked by mechanical fastening using elastic materials such as rubber and cork, and the room temperature curing type silica gel can be tried as a sealing material.
2018/08/02 10:11:16 6611 次

Hot News

Copy right of the 2018 Wuxi Funecon Precision Mould Plastic Co., Ltd. All Rights Reserved

美联储主席之争进入白热化了,华尔街和华盛顿“暗流涌动”,特朗普“举棋不定” 平陆运河广西钦州城区首座跨运河桥梁建成通车 “易中天”携手大涨,新易盛再创新高!光芯片迎新突破,双创龙头ETF(588330)盘中涨近3% 【IPO追踪】公开发售认购倍数年内倒数第二!南华期货上市即破发 2.5万字|柏基“传奇基金经理”安德森的罕见深访:伟大公司各有各的独特,平庸公司却都差不多 报告指,新业态从业人员社会保障制度逐步完善 曾连续62个交易日无成交 威海银行H股定增何以吸引津联集团溢价约18%参与? 广西柳州武警举办军人集体婚礼 投资8亿余元 正帆科技年产8万吨高纯炭基新材料生产线顺利投产|新材料 武汉圣都整装品牌服务全面升级,聚焦“资金存管”破解家装信任难题 国投丰乐:2023年、2024年连续两年种业收入创历史新高|种业 国金证券:首予康宁杰瑞制药-B“买入”评级 目标价14.30港元|康宁杰瑞制药 在储能、风电、光伏、智慧电网等领域施展拳脚 上市公司勇挑“能源强国建设”大梁|双碳 “应急灯龙头”易主|国海 人民币现金收付及服务迎新规 满足多层次支付需求 Datatist画龙科技宋碧莲:“商业决策大模型”可帮助企业一年落地10万场营销活动 广西国资拟入主! 这家公司复牌涨停|广西 民调:韩国总统李在明施政支持率降至53.4% 全球饰面大会 全球第9, 远东再次实力登榜!|远东 澳最大养老基金削减全球股票配置:担忧AI降温 “合肥造”机器人化身“蜘蛛侠” 高空清洁作业如履平地